QUALITY

Define the evidence
before product release.

The product requirement determines what is checked, when it is checked and who approves the result. CiTech coordinates the applicable records from supplier capability review through shipment release.

Real hardness testing equipment available through a qualified partner manufacturing resource
PROJECT EVIDENCEVerification resources are assigned to the product requirement.Partner resource · inspection basis · recorded release decision

Evidence follows the decisions that release the product.

01

Controlled product brief

Requirements, use conditions, interfaces, acceptance priorities and current revision basis.

02

Sample and revision record

Prototype or first-article status, changes, deviations and approved reference condition.

03

Inspection and correction record

Defined checkpoints, findings, supplier response and corrective-action closure.

04

Pack-out and release file

Packaging, labels, quantities and applicable commercial or logistics records.

Controls are applied where the product and project risk require them.

Gate 01

Capability review

Confirm process, equipment, material and technical fit.

Gate 02

Quotation and sample basis

Align scope, tooling, sample purpose and approval responsibility.

Gate 03

First article

Verify revision, material, finish, fit and critical characteristics.

Gate 04

Production controls

Apply checks according to product risk and agreed scope.

Gate 05

Pack-out and release

Confirm packaging, quantities and required release records.

Plan verification before production release.

Controls are chosen from the product requirement, supplier capability and project risk. Product-specific testing or certification is assigned to qualified resources when required.